Facilities Feasibility Studies

2017 10-Year Facilities Feasibility Study
- Introduction
- Facility Condition Analysis – HES
- Facility Condition Analysis – WIS
- Facility Condition Analysis – WMS
- Facility Condition Analysis – WHS
- Facility Program Utilization – Part 1
- Facility Program Utilization – Part 2
- Conceptual Facilities Design Options – HES
- Conceptual Facilities Design Options – WIS
- Conceptual Facilities Design Options – WMS
- Conceptual Facilities Design Options – WHS
- Conceptual Facilities Design Options – Campus Master Plan
- School Enrollment Analysis and Projections – Part 1
- School Enrollment Analysis and Projections – Part 2
- Appendix – Part 1
- Appendix – Part 2
- Appendix – Part 3

Facilities Feasibility Study - Phase 2
- Phase 2 Feasibility Study Preliminary Report
- Reconfiguration Scenario Matrix 12.13.18
- Reconfiguration Scenario Matrix 12.21.18
- Analysis of Three Site Scenarios and Options
- WHS and WMS Site Analysis
- WMS Conceptual Program Needs
- WHS School Program
- WIS as Middle School Program
- WIS Site Analysis
- WMS Conceptual Program Needs
- WMS Conceptual Floor Plan
- Conceptual Large Elementary School Program
- HES Site Analysis
- WIS as Middle School Conceptual Floor Plan
- HES Conceptual Site Plan
- HES Conceptual Floor Plan
- WMS Conceptual Site Plan
- WMS Conceptual New Floor Plan
- WMS Conceptual New Floor Plan 2nd Floor
- 4 Site Versus 3 Site Cost Comparison